How it works
From a tenant’s photograph to a closed repair, in one record
Eight steps, most of them done by the people already involved: the tenant who noticed, the contractor who fixed it. You decide; the record writes itself as they go.
01
Add a property, room by room
What the building is and how you let it are two separate facts. A terraced house can be one tenancy or five. Say which, name the rooms and the shared areas, and record who lives where. Every tenancy belongs to a room or a whole home, never vaguely to an address.
- Issued
- 14 Nov 2026
- Next due
- 13 Nov 2027
- Gas Safe number
- 548213
Nothing is saved until you confirm it. Every suggestion stays labelled as one in the record.
02
Switch on the duties, upload what you have
Ten obligations for a rented home are already there, seeded for England, each with its interval and the evidence that satisfies it. Your own duties as a landlord in any of the four nations sit beside them. Tick the ones that apply. Attach the certificates you already hold and the dates on them are read off and offered back for you to check, so the next due date is right from the first day.
Each duty shows the law it comes from and the date we last read it. The ten, in full.
03 · 04
The people already involved do their part on a phone
Neither a tenant nor a contractor ever creates an account or installs anything. Each gets a link that does one job. A tenant proves they live there with a one-time code. A contractor’s link is for that repair alone and stops working when it is done.
Reports on a link or a QR code
A card on the back of the door carries the code. They scan it, say what is wrong, add photographs, and get a receipt by email with a link to follow that one repair.
Gets a link for that one repair
They see the report and the photographs, propose a visit, and upload what they did while they are still on site, when the evidence actually exists.
05
They agree the visit between themselves
You are not the switchboard. The contractor proposes a date and a time window from their link; the tenant agrees or suggests another from theirs. Every proposal is its own line, so a reschedule never erases what was tried, and you can see the whole exchange without having been in it.
Your own date, the one the repair should be dealt with by, stays between you and the contractor.
06
Nothing closes without the evidence
A safety or compliance repair cannot be closed until the proof that would satisfy an inspector is on the record. If it is not there, the button says why, and you can ask the contractor for it instead of guessing.
Every photograph, note and certificate is fingerprinted when it arrives, with who added it and on whose behalf. The original bytes are never changed, so a copy can be checked against the record years later.
07
The timeline only grows
Each property has one record of everything that happened to it, in order, written as things happen. Nothing in it is ever edited or deleted. A mistake is corrected by a new entry that says so. That is what makes it worth showing to somebody.
Six months later, when the council writes, this is the answer.
08
Hand it over as a document
Eight documents, each from your own records, each saying who it is safe to show. On screen, as a PDF, a spreadsheet or an archive of the files themselves, or on a link that expires and can be revoked. Every one you produce is kept for six years with its fingerprint, so the same document can be handed over again.
Thirty days of everything, no card
Add a property, switch on its duties and upload what you already hold. If it is not for you, your records are still yours to download.